Skip to content
DP World
Please enable Javascript to use this site.
Fraser Surrey
Safety Documents
Safe Work Procedures
Maintenance
/ Crane Shop
Crane Shop
SWP – MCS01 – Safe Work Practices V4
SWP – MCS05 – Spill Clean-Up V3
SWP – MCS07 – Steam Cleaner V3
SWP – MCS09 – Dispensing Oils V3
SWP – MCS10 – Boom Cable Lubing Service V3
SWP – MCS11 – Monthly and Quarterly Routine Crane Service V3
SWP – MCS13 – Main Hoist Cable V3
SWP – MCS14 – Radio Etiquette and Positive Communication V3
SWP – MCS16 – Meal Hour Spreader Checks V3
SWP – MCS17 – Trolley Rail Service V3
SWP – MCS18 – Barge Ramp Maintenance V3
SWP – MCS19 – Working along Bullrail V3
SWP – MCS20 – Travelling of Dock Gantry Cranes V3
SWP – MCS22 – Berth Face Painting V3
SWP – MCS24 – Cleaning with Compressed Air V2
SWP – MCS25 – Crane Shop Table Saw V3
SWP – MCS26 – Power Outage V2
SWP – MCS28 – Main Host Cable Change
SWP – MCS29 – Gantry Trolley Rail Adjustment V2
SWP – MCS30 – High Angle Rescue Designated Rescue Team V2
SWP – MCS31 – Revolver Misting System Setup V2
SWP – MCS32 – Transporting the Revolver Spreader V2
SWP – MCS33 – Revolver Spreader Troubleshoot V2
SWP – MCS34 – Revolver Spreader Check at Meal Period V2
SWP – MCS35 – Berth 10 Finger Lights
SWP – MCS36 – LOTOTO-SUBSTATIONS-Substation 10 MCC Lockout V2
SWP – MCS37 – LOTOTO-SUBSTATIONS-Substation 10 MV Lockout V2
SWP – MCS38 – Maintenance Work Near the Water V2
SWP – MCS39 – PPE Requirements for Electrical Work V2
SWP – MCS40 – Substation 2 Dry Transformer and Downstream Isolation V2
SWP – MCS43 – Substation 6 De-Energization V2
SWP – MCS44 – CRANE-Crane 3 Power Breaker E-House V2
SWP – MCS45 – CRANE-Machine House Overhead Light Replacement
SWP – MCS46 – CRANE-Operating Bypass Features V2
SWP – MCS47 – CRANE-TLS Oil Change Procedure V2
SWP – MCS48 – CRANE-5 Year Load Test Procedure V2
SWP – MCS49 – CRANE Boom Cable Change Procedure
SWP – MCS50 – LOTOTO-Crane 3 Motion
SWP – MCS51 – LOTOTO-Crane 3 Slip Rings
SWP – MCS52 – LOTOTO-Crane 4 and 5 Motion
SWP – MCS53 – LOTOTO-Crane 4 and 5 Slip Rings
SWP – MCS54 – LOTOTO – CRANE 3 MV Lockout
SWP – MCS55 – LOTOTO-Substation 1
SWP – MCS56 – LOTOTO-Substation 2
SWP – MCS57 – LOTOTO – Substation 3
SWP – MCS58 – LOTOTO – Substation 4
SWP – MCS59 – Crane E-House and Boom – Cable Installation
SWP – MCS60 – CRANE-Operator & Checker Cab Glass Replacement V1
SWP – MCS61 – CRANE-Cranes Headblock Sheave Replacement V1
SWP – MCS62 – CRANE-Cranes TLS Sheave Replacement V1
SWP – MCS63 – CRANE-Cranes Trolley Sheave Replacement V1
SWP – MCS64 – Grating Replacement on Cranes V1
SWP – MCS65 – 20′-40′ Lashing and Safety Container Power Connection V1
SWP – MCS66 – Canola Oil E-House MV LOTOTO V1
SWP – MCS67 – Canola Oil E-House LV LOTOTO V1
SWP – MCS69 – Auxiliary Hoist Operation V1
SWP – MCS73 – Flipping Overhead Gear V1
Search All Fraser Surrey Safety Documents